IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0350 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $9,435 $9,200 Implemented
MZ0350 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,082 $600 Implemented
MZ0345 # 06 Y:2023 06 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,711 $1,945 Implemented
MZ0345 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,287 $840 Implemented
MZ0345 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,738 $3,090 Implemented
MZ0345 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,154 $220 Implemented
MZ0345 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,065 $22,618 Implemented
MZ0345 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,404 $14,030 Implemented
DL0195 # 04 Y:2021 04 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $48,560 $210,000 Implemented
DL0195 # 06 Y:2021 06 2021 INSTALL TIMERS AND/OR THERMOSTATS $520 $236 Implemented
DL0195 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,030 $532 Implemented
DL0195 # 02 Y:2021 02 2021 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,870 $0 Implemented
DL0195 # 01 Y:2021 01 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,950 $5,445 Implemented
DL0195 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,950 $8,214 Implemented
DL0195 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,430 $7,309 Implemented
DL0195 # 12 Y:2021 12 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,495 $34,144 Implemented
GT0911 # 03 Y:2018 03 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $310 $180 Implemented
GT0911 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $5,633 Implemented
GT0911 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,999 $3,000 Implemented
DL0132 # 11 Y:2014 11 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $8,380 $0 Implemented
DL0132 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,320 $13,455 Implemented
DL0132 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,480 $1,375 Implemented
DL0132 # 10 Y:2014 10 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $860 $0 Implemented
DL0132 # 07 Y:2014 07 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,920 $1,000 Implemented
DL0132 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $11,450 $1,000 Implemented