IAC logo
IAC Assessment: DL0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2014
Principal Product Composite Parts & Laminates
NAICS 326130 - Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $5,000,000-$10,000,000
# of Employees 44
Plant Area (Sq.Ft.) 47,000
Annual Production 0 Units
Production Hrs. Annual 4,602
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,299 618,785 kWh $0.13
Natural Gas $73,756 7,282 MMBtu $10.13
TOTAL ENERGY COSTS $155,055
RECOMMENDED SAVINGS* $61,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,440
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,820
Cost:
$17,500
$10,820 82,600 - - $10,820
82,600
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,480
Cost:
$1,375
$3,480 26,019 - - $3,480
26,019
kWh
-
-
MMBtu
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,657
Cost:
$2,600
$2,657 20,285 - - $2,657
20,285
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,450
Cost:
$1,000
- - $11,450 1,139 -
-
kWh
$11,450
1,139
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,000
Cost:
$3,000
- - $5,000 494 -
-
kWh
$5,000
494
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,800
Cost:
$4,000
- - $3,800 375 -
-
kWh
$3,800
375
MMBtu
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,920
Cost:
$1,000
$2,920 22,329 - - $2,920
22,329
kWh
-
-
MMBtu
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,350
Cost:
$1,600
$1,350 10,290 - - $1,350
10,290
kWh
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,580
Cost:
$7,000
$4,580 34,990 - - $4,580
34,990
kWh
-
-
MMBtu
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$860
Cost:
-
- - $860 85 -
-
kWh
$860
85
MMBtu
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,380
Cost:
-
- - $8,380 827 -
-
kWh
$8,380
827
MMBtu
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,320
Cost:
$13,455
$4,320 32,970 - - $4,320
32,970
kWh
-
-
MMBtu
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,030
Cost:
$14,000
$2,030 15,475 - - $2,030
15,475
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$61,647
Cost:
$66,530
$32,157 244,958 $29,490 2,920 $32,157
244,958
kWh
$29,490
2,920
MMBtu
TOTAL IMPLEMENTED Savings:
$33,440
Cost:
$30,830
$12,750 96,793 $20,690 2,051 $12,750
96,793
kWh
$20,690
2,051
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas