IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

410

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0042 # 09 Y:1993 09 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $10,717 $11,800 Not Implemented
SD0042 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,753 $2,420 Implemented
HO0015 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $926 $2,367 Not Implemented
HO0015 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,577 $220 Not Implemented
HO0015 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $569 $220 Not Implemented
HO0015 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,732 $1,200 Not Implemented
HO0015 # 05 Y:1992 05 1992 INSULATE BARE EQUIPMENT $597 $183 Not Implemented
HO0015 # 06 Y:1992 06 1992 REDUCE VENTILATION AIR $8,676 $4,850 Not Implemented
HO0015 # 07 Y:1992 07 1992 INSTALL STORM WINDOWS AND DOORS $246 $212 Not Implemented
UD0346 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $7,193 $5,000 Implemented
UD0346 # 02 Y:1991 02 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $7,995 $0 Implemented
UD0346 # 03 Y:1991 03 1991 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,769 $0 Implemented
UD0346 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $5,106 $5,000 Implemented
UD0346 # 05 Y:1991 05 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,053 $0 Implemented
UD0334 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,567 $0 Implemented
UD0334 # 02 Y:1991 02 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,627 $4,000 Implemented
UD0334 # 03 Y:1991 03 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,208 $0 Implemented
TN0380 # 01 Y:1989 01 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $67,651 $61,200 Implemented
TN0380 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $4,181 $75 Implemented
TN0380 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,143 $6,750 Implemented
TN0380 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,910 $420 Implemented
TN0380 # 05 Y:1989 05 1989 INSTALL SET-BACK TIMERS $6,151 $6,350 Not Implemented
TN0380 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,869 $440 Not Implemented
MA0163 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $285 Implemented
MA0163 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,427 $0 Implemented