IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

399

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0492 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,082 $105 Not Implemented
IA0492 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,450 $590 Not Implemented
AM0615 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $13,704 $10,754 Implemented
AM0615 # 06 Y:2012 06 2012 REPAIR OR REPLACE STEAM TRAPS $10,200 $273 Implemented
AM0615 # 10 Y:2012 10 2012 USE SYNTHETIC LUBRICANT $760 $0 Implemented
AM0615 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,788 $13 Implemented
AM0615 # 08 Y:2012 08 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,659 $875 Implemented
AM0615 # 07 Y:2012 07 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,909 $27,494 Implemented
AM0615 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,856 $27,318 Implemented
AM0615 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,924 $900 Implemented
AM0615 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,021 $107,528 Not Implemented
AM0615 # 01 Y:2012 01 2012 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $455,515 $1,000,000 Not Implemented
AM0613 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $694 $108 Implemented
AM0613 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $3,000 $1,000 Implemented
AM0613 # 07 Y:2012 07 2012 USE PHOTOCELL CONTROLS $49 $100 Implemented
AM0613 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,265 $600 Implemented
AM0613 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $14,800 $2,230 Not Implemented
AM0613 # 02 Y:2012 02 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $16,300 $20,900 Implemented
AM0613 # 01 Y:2012 01 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,010 $38,103 Implemented
LE0317 # 16 Y:2011 16 2011 INSTALL OCCUPANCY SENSORS $153 $1,000 Implemented
LE0317 # 14 Y:2011 14 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Not Implemented
LE0317 # 13 Y:2011 13 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,553 $2,440 Implemented
LE0317 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,001 $4,500 Not Implemented
LE0317 # 11 Y:2011 11 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,938 $3,000 Implemented
LE0317 # 05 Y:2011 05 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,299 $75,000 Not Implemented