IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0327 # 10 Y:1995 10 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $500 Not Implemented
MA0327 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $0 Implemented
MA0327 # 08 Y:1995 08 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,903 $1,500 Implemented
MA0327 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,226 $0 Not Implemented
MA0327 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,001 $12,431 Not Implemented
MA0327 # 05 Y:1995 05 1995 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,033 $0 Implemented
MA0327 # 04 Y:1995 04 1995 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $9,488 $0 Implemented
MA0327 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,441 $36,400 Implemented
MA0327 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,094 $90,000 Not Implemented
MA0327 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,783 $0 Implemented
MA0163 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $9,247 $7,253 Not Implemented
MA0163 # 06 Y:1989 06 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,603 $13,662 Not Implemented
MA0163 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,890 $4,255 Not Implemented
MA0163 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,670 $0 Not Implemented
MA0163 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,427 $0 Implemented
MA0163 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $285 Implemented
MA0021 # 06 Y:1985 06 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,902 $4,380 Not Implemented
MA0021 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,005 $3,702 Not Implemented
MA0021 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $435 $100 Not Implemented
MA0021 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,822 $105 Implemented
MA0021 # 02 Y:1985 02 1985 BURN WOOD BY-PRODUCTS FOR HEAT $2,010 $8,450 Implemented
MA0021 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $454 $0 Implemented
MA0007 # 01 Y:1984 01 1984 INSTALL SET-BACK TIMERS $543 $650 Implemented
MA0007 # 03 Y:1984 03 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,692 $70,668 Not Implemented
MA0007 # 02 Y:1984 02 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,690 $3,000 Implemented