Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 3083 | Laminated Plastics Plate & Sheet |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0820 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,925 | $4,465 | Implemented |
UD0820 # 14 Y:2010 | 14 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $4,962 | $4,550 | Implemented |
UD0820 # 13 Y:2010 | 13 | 2010 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $7,994 | $45,000 | Not Implemented |
UD0820 # 12 Y:2010 | 12 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,849 | $39,289 | Not Implemented |
UD0820 # 11 Y:2010 | 11 | 2010 | INSULATE BARE EQUIPMENT | $3,075 | $8,700 | Not Implemented |
UD0820 # 10 Y:2010 | 10 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $17,532 | $7,000 | Implemented |
UD0820 # 09 Y:2010 | 09 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $513 | $1,580 | Implemented |
UD0820 # 08 Y:2010 | 08 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $535 | $500 | Implemented |
UD0820 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $50 | $45 | Not Implemented |
UD0820 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,316 | $2,585 | Implemented |
UD0820 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,757 | $4,868 | Implemented |
UD0820 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,408 | $5,940 | Implemented |
UD0820 # 02 Y:2010 | 02 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $644 | $1 | Implemented |
UD0820 # 01 Y:2010 | 01 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $27,511 | $30,000 | Not Implemented |
UD0334 # 03 Y:1991 | 03 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $5,208 | $0 | Implemented |
UD0334 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,627 | $4,000 | Implemented |
UD0334 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,567 | $0 | Implemented |
UD0121 # 01 Y:1984 | 01 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,826 | $28,200 | Not Implemented |
UD0121 # 02 Y:1984 | 02 | 1984 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,578 | $15,000 | Not Implemented |