IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

397

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0021 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $7,062 $5,600 Implemented
AM0021 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $2,294 $1,450 Implemented
AM0021 # 04 Y:1988 04 1988 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,556 $300 Implemented
AM0021 # 06 Y:1988 06 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $652 $500 Implemented
KU0218 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,063 $25,287 Implemented
KU0218 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $5,457 $2,500 Implemented
KU0218 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,325 $500 Implemented
KU0218 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,335 $305 Implemented
CO0053 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,025 $1,200 Implemented
CO0053 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,522 $280 Implemented
CO0053 # 07 Y:1986 07 1986 IMPROVE LUBRICATION PRACTICES $1,616 $0 Implemented
CO0053 # 09 Y:1986 09 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,286 $50,000 Implemented
CO0053 # 10 Y:1986 10 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,306 $842 Implemented
KU0094 # 01 Y:1983 01 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,596 $800 Implemented
KU0094 # 02 Y:1983 02 1983 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,270 $360 Implemented
KU0094 # 03 Y:1983 03 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,187 $715 Implemented
KU0094 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $1,127 $1,200 Implemented
KU0094 # 05 Y:1983 05 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $953 $300 Implemented
KU0094 # 06 Y:1983 06 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $240 Implemented
KU0094 # 07 Y:1983 07 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $342 $0 Implemented
KU0054 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,358 $11,910 Implemented
KU0054 # 05 Y:1982 05 1982 USE OPTIMUM THICKNESS INSULATION $1,888 $880 Implemented