IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0611 # 08 Y:2024 08 2024 INSTALL TURBULATORS $2,454 $3,750 n/a
UF0611 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,650 $720 n/a
UF0611 # 06 Y:2024 06 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,901 $7,320 n/a
UF0611 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,576 $19,104 n/a
UF0611 # 04 Y:2024 04 2024 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $26,100 $0 n/a
UF0611 # 03 Y:2024 03 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $30,134 $5,900 n/a
UF0611 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $36,892 $25,400 n/a
UF0611 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $99,213 $111,120 n/a
GT0906 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $949 $1,754 Implemented
GT0906 # 01 Y:2017 01 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,227 $1,200 Implemented
GT0906 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,228 $13,889 Implemented
GT0906 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $149 $304 Not Implemented
GT0906 # 05 Y:2017 05 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $190,765 $2,426,160 Not Implemented
GT0873 # 06 Y:2010 06 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,661 $775 Implemented
GT0873 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $816 $4,400 Implemented
GT0873 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $3,777 $10,640 Implemented
GT0873 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,825 $19,768 Not Implemented
GT0873 # 02 Y:2010 02 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,144 $4,600 Not Implemented
GT0873 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,353 $0 Implemented
GT0685 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,955 $0 Implemented
GT0685 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,950 $4,740 Not Implemented
GT0685 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $144,500 $150,000 Not Implemented
GT0685 # 06 Y:2000 06 2000 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $93,536 $30,000 Not Implemented
GT0685 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $28,840 $7,000 Implemented
GT0685 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $714 $500 Implemented