IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0352 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $374 $600 Not Implemented
BD0352 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $699 $700 Not Implemented
BD0352 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,734 $6,000 Not Implemented
BD0352 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,592 $20,350 Not Implemented
BD0352 # 06 Y:2008 06 2008 USE RADIANT HEATER FOR SPOT HEATING $2,435 $3,180 Not Implemented
BD0352 # 07 Y:2008 07 2008 $11,838 $18,000 Not Implemented
BD0352 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,385 $253,134 Not Implemented
WI0268 # 11 Y:1996 11 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $201 $700 Not Implemented
WI0268 # 10 Y:1996 10 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $353 $0 Not Implemented
WI0268 # 09 Y:1996 09 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,415 $500 Not Implemented
WI0268 # 08 Y:1996 08 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,701 $0 Not Implemented
WI0268 # 07 Y:1996 07 1996 CONVERT TO AQUEOUS CLEANING $1,850 $4,500 Not Implemented
WI0268 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,631 $740 Not Implemented
WI0268 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,400 $0 Not Implemented
WI0268 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $267 $400 Not Implemented
WI0268 # 03 Y:1996 03 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,583 $0 Not Implemented
WI0268 # 02 Y:1996 02 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,104 $0 Not Implemented
WI0268 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,745 $1,950 Not Implemented
WI0097 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $0 Not Implemented
WI0097 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $930 $2,397 Not Implemented
WI0097 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,135 $1,200 Not Implemented
WI0097 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,833 $2,500 Not Implemented
WI0097 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $46 Not Implemented
WI0097 # 03 Y:1990 03 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,745 $20,000 Not Implemented
WI0097 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $509 $1,200 Not Implemented