IAC logo
IAC Assessment: BD0352
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0352
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2008
Principal Product plastic containers
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 877,000
Annual Production 295,699,564 Pieces
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,346,074 46,883,372 kWh $0.05
Electricity Demand $131,850 168,449 kW-months/year $0.78
Electricity Fees $170,842 - $ -
Natural Gas $80,664 9,284 MMBtu $8.69
TOTAL ENERGY COSTS $2,813,170
RECOMMENDED SAVINGS* $103,057 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$53,385
Cost:
$253,134
$51,883 1,037,661 $1,502 2,116 - - - - - - $51,883
1,037,661
kWh
$1,502
2,116
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$374
Cost:
$600
$309 6,179 $65 91 - - - - - - $309
6,179
kWh
$65
91
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$699
Cost:
$700
$433 8,655 $8 12 - - - - $258 - $433
8,655
kWh
$8
12
kW-months/year
-
-
$
-
-
MMBtu
$258
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$18,734
Cost:
$6,000
$18,376 367,526 $358 504 - - - - - - $18,376
367,526
kWh
$358
504
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,592
Cost:
$20,350
$15,294 305,889 $298 419 - - - - - - $15,294
305,889
kWh
$298
419
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,435
Cost:
$3,180
- - - - - - $2,435 906 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,435
906
MMBtu
-
-
$
07: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$11,838
Cost:
$18,000
- - - - $11,838 - - - - - -
-
kWh
-
-
kW-months/year
$11,838
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$103,057
Cost:
$301,964
$86,295 1,725,910 $2,231 3,142 $11,838 - $2,435 906 $258 - $86,295
1,725,910
kWh
$2,231
3,142
kW-months/year
$11,838
-
$
$2,435
906
MMBtu
$258
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost