IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

912

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0178 # 02 Y:2020 02 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $470 $750 Not Implemented
DL0178 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,900 $2,750 Not Implemented
DL0178 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,720 $2,500 Not Implemented
DL0178 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $910 $1,000 Not Implemented
DL0178 # 04 Y:2020 04 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,880 $10,000 Not Implemented
DL0178 # 01 Y:2020 01 2020 RECOVER AND REUSE COOLING WATER $13,590 $4,000 Not Implemented
DL0178 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $640 $60 Not Implemented
MA0806 # 01 Y:2019 01 2019 USE SOLAR HEAT FOR HEAT $131,256 $566,995 Implemented
MA0806 # 04 Y:2019 04 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,289 $15,750 Implemented
MA0806 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,287 $750 Implemented
MA0806 # 03 Y:2019 03 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,496 $71,032 Not Implemented
OR0719 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,031 $9,861 Implemented
OR0719 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $7,063 $6,896 Implemented
OR0719 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $8,576 $12,018 Implemented
UU0122 # 03 Y:2017 03 2017 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $15,162 $26,440 Not Implemented
UU0122 # 02 Y:2017 02 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $55,559 $500 Implemented
UU0122 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $7,349 $800 Implemented
UU0122 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $5,324 $11,240 Not Implemented
UU0122 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,745 $0 Not Implemented
UU0122 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $6,799 $4,244 Implemented
UU0122 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $204,798 $0 Not Implemented
SU0448 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $4,442 $1,512 Implemented
SU0448 # 11 Y:2017 11 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,224 $37,300 Implemented
SU0448 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $256 $260 Implemented
SU0448 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,132 $0 Implemented