Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
367
matching recommendationsSIC | 3087 | Custom Compound Purchased Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0357 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,034 | $10,040 | n/a |
MZ0357 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,213 | $18,604 | n/a |
MZ0357 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,080 | $8,267 | n/a |
MZ0357 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,903 | $852,600 | n/a |
MZ0357 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,721 | $18,298 | n/a |
MZ0357 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,288 | $440 | n/a |
MZ0357 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $482 | $2,100 | n/a |
TT0294 # 10 Y:2023 | 10 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $974 | $500 | Implemented |
TT0294 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT FOR HEAT | $4,761 | $15,950 | Not Implemented |
TT0294 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,236 | $7,500 | Implemented |
TT0294 # 01 Y:2023 | 01 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $77,940 | $2,000 | Implemented |
TT0294 # 11 Y:2023 | 11 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $88 | $100 | Implemented |
TT0294 # 06 Y:2023 | 06 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,671 | $500 | Implemented |
TT0294 # 03 Y:2023 | 03 | 2023 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $14,815 | $12,000 | Implemented |
TT0294 # 05 Y:2023 | 05 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $6,563 | $18,000 | Not Implemented |
TT0294 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,950 | $3,100 | Implemented |
TT0294 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,944 | $43,883 | Implemented |
TT0294 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,938 | $40 | Not Implemented |
TT0285 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,920 | $13,000 | Implemented |
TT0285 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,020 | $33,675 | Not Implemented |
TT0285 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $616 | $2,793 | Implemented |
TT0285 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $12,364 | $55,000 | Not Implemented |
TT0285 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,051 | $12,000 | Not Implemented |
TT0285 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,293 | $3,600 | Implemented |
TT0285 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,451 | $1,225 | Implemented |