IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,860

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0189 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $1,248 $716 Implemented
IP0189 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,450 $33 Implemented
IP0189 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,822 $0 Implemented
IP0189 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,852 $325 Implemented
IP0189 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43,723 $84,496 Implemented
LE0559 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $704 $450 Implemented
LE0559 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $100 Implemented
WM0209 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,061 $3,250 Implemented
WM0209 # 02 Y:2024 02 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,576 $1,700 Implemented
WM0209 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $9,737 $0 Implemented
MU0042 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $340 Implemented
IC0292 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,786 $0 Implemented
IC0292 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $19,216 $10,388 Implemented
IC0292 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,518 $9,738 Implemented
IC0292 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $434 $0 Implemented
UF0602 # 08 Y:2023 08 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,084 $4,788 Implemented
UF0602 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26,608 $0 Implemented
UF0602 # 02 Y:2023 02 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $389,519 $50,482 Implemented
UF0602 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268,820 $137,250 Implemented
UF0602 # 10 Y:2023 10 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $215,016 $0 Implemented
UF0602 # 09 Y:2023 09 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $341,860 $20,000 Implemented
UF0602 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339,285 $786,250 Implemented
TT0304 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $51,075 $120 Implemented
TT0304 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $6,857 $372 Implemented
TT0304 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $405 Implemented