IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,878

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0018 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,449 $2,110 Implemented
SF0018 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,245 $2,128 Implemented
SF0018 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,207 $520 Implemented
SF0018 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $351 $735 Implemented
UF0080 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,252 $9,802 Implemented
UF0080 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,272 $594 Implemented
UF0078 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,587 $750 Implemented
UF0078 # 06 Y:1994 06 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $906 $0 Implemented
IA0073 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,897 $18,400 Implemented
IA0073 # 05 Y:1994 05 1994 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $1,745 $9,000 Implemented
IA0073 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $1,319 $855 Implemented
IA0073 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,254 $862 Implemented
IA0073 # 09 Y:1994 09 1994 OPTIMIZE PLANT POWER FACTOR $1,451 $4,140 Implemented
OK0419 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,338 $0 Implemented
OK0419 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $275 $432 Implemented
KU0418 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,422 $2,228 Implemented
SF0014 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,017 $4,460 Implemented
SF0014 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,329 $3,611 Implemented
SF0014 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,817 $600 Implemented
MA0284 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $689 $685 Implemented
MA0284 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $158 $0 Implemented
SF0007 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $71,048 $21,073 Implemented
SF0007 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,622 $1,988 Implemented
SF0007 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22,511 $12,625 Implemented
SF0007 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,025 $900 Implemented