IAC logo
IAC Assessment: SD0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1994
Principal Product Plastic Injection Molded Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $565,187 7,966,296 kWh $0.07
Natural Gas $52,296 9,250 MMBtu $5.65
TOTAL ENERGY COSTS $617,483
RECOMMENDED SAVINGS* $164,981 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,813
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$29,182
Cost:
$22,260
$29,182 411,196 $29,182
411,196
kWh
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$18,252
Cost:
$73,354
$18,252 257,327 $18,252
257,327
kWh
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,565
Cost:
-
$5,565 - $5,565
-
kWh
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$90,168
Cost:
$27,490
$90,168 1,270,516 $90,168
1,270,516
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,631
Cost:
$11,471
$14,631 197,245 $14,631
197,245
kWh
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,477
Cost:
$5,450
$6,477 79,426 $6,477
79,426
kWh
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$706
Cost:
$616
$706 8,792 $706
8,792
kWh
TOTAL RECOMMENDED Savings:
$164,981
Cost:
$140,641
$164,981 2,224,502 $164,981
2,224,502
kWh
TOTAL IMPLEMENTED Savings:
$43,813
Cost:
$33,731
$43,813 608,441 $43,813
608,441
kWh