IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2305 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,833 $0 Implemented
UC2305 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,923 $0 Implemented
UC2305 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $1,300 Implemented
UC2305 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $414 $300 Implemented
UC2305 # 09 Y:2023 09 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,885 $28,876 Implemented
UC2305 # 02 Y:2023 02 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,483 $0 Implemented
UC2305 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $6 $0 Implemented
MA0765 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,000 $1,000 Implemented
MA0765 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $1,080 $900 Implemented
MA0765 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,576 $1,152 Implemented
MA0765 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $15,004 $12,000 Implemented
MA0387 # 04 Y:1997 04 1997 PAY BILLS ON TIME TO AVOID LATE FEES $3,251 $0 Implemented
MA0387 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,430 $1,230 Implemented
MA0284 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $158 $0 Implemented
MA0284 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $689 $685 Implemented
MA0245 # 02 Y:1992 02 1992 REDESIGN PROCESS $4,412 $1,554 Implemented
MA0246 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,358 $2,672 Implemented
MA0245 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $2,833 $5,040 Implemented
MA0245 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,237 $0 Implemented
MA0246 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $443 $386 Implemented
MA0246 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $100 $85 Implemented
MA0246 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $526 $0 Implemented
MA0238 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $2,305 $0 Implemented
MA0238 # 08 Y:1992 08 1992 MODERATE COOLING TOWER OUTLET TEMPERATURE $181 $100 Implemented
MA0238 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,814 $2,053 Implemented