Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
307
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0293 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,924 | $910 | Implemented |
MZ0293 # 07 Y:2020 | 07 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,010 | $25,500 | Not Implemented |
MZ0293 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $230 | $780 | Implemented |
MZ0293 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,827 | $320 | Implemented |
MZ0293 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,762 | $88,053 | Implemented |
MZ0293 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,246 | $6,782 | Implemented |
MZ0293 # 09 Y:2020 | 09 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,186 | $28,360 | Not Implemented |
MZ0293 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $328,879 | $538,653 | Implemented |
MZ0290 # 05 Y:2020 | 05 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,411 | $298 | Implemented |
MZ0290 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,714 | $3,096 | Implemented |
MZ0290 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,559 | $1,091 | Implemented |
MZ0290 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $1,134 | $4,935 | Implemented |
MZ0290 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,247 | $2,264 | Implemented |
MZ0290 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $767 | $1,272 | Not Implemented |
MZ0290 # 02 Y:2020 | 02 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,851 | $3,250 | Not Implemented |
MZ0289 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $2,151 | $7,144 | Implemented |
MZ0289 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM THICKNESS INSULATION | $3,128 | $4,056 | Implemented |
MZ0289 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,467 | $1,422 | Not Implemented |
MZ0289 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,651 | $3,250 | Not Implemented |
MZ0289 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,636 | $1,117 | Implemented |
MZ0289 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,118 | $270 | Implemented |
MZ0289 # 01 Y:2020 | 01 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,779 | $20,692 | Not Implemented |
MZ0261 # 05 Y:2019 | 05 | 2019 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $163 | $0 | Implemented |
MZ0261 # 04 Y:2019 | 04 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $107,654 | $78,000 | Implemented |
MZ0261 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71,753 | $36,641 | Implemented |