IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,538

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0019 # 11 Y:1985 11 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $906 $175 Implemented
ST0019 # 12 Y:1985 12 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,567 $1,900 Implemented
ST0019 # 13 Y:1985 13 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,654 $537 Implemented
ST0019 # 14 Y:1985 14 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $2,858 $150 Implemented
UD0151 # 01 Y:1985 01 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $162 $0 Not Implemented
UD0151 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,349 $315 Implemented
UD0151 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $795 $284 Not Implemented
OK0156 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $567 $161 Not Implemented
OK0156 # 02 Y:1985 02 1985 OPTIMIZE PLANT POWER FACTOR $5,639 $7,640 Implemented
OK0156 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,728 $14,629 Not Implemented
OK0156 # 04 Y:1985 04 1985 RECOVER AND REUSE COOLING WATER $1,387 $500 Implemented
OK0156 # 05 Y:1985 05 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,307 $624 Implemented
OK0156 # 06 Y:1985 06 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,735 $0 Not Implemented
OK0156 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,633 $531 Not Implemented
OK0156 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $300 $329 Not Implemented
OK0156 # 09 Y:1985 09 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,230 $300 Not Implemented
OK0156 # 10 Y:1985 10 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,411 $0 Implemented
OK0156 # 11 Y:1985 11 1985 INSULATE BARE EQUIPMENT $290 $880 Implemented
OK0156 # 12 Y:1985 12 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,431 $0 Not Implemented
MA0015 # 01 Y:1985 01 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,812 $4,280 Not Implemented
MA0015 # 02 Y:1985 02 1985 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $991 $1,035 Not Implemented
MA0015 # 03 Y:1985 03 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $36,316 $15,000 Not Implemented
MA0015 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $1,416 $4,000 Not Implemented
KU0150 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $3,365 Not Implemented
KU0150 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $993 $1,300 Not Implemented