Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,502
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0304 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $6,857 | $372 | n/a |
TT0304 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,867 | $5 | n/a |
TT0304 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $12,488 | $40,000 | n/a |
TT0304 # 03 Y:2023 | 03 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $38,784 | $10,000 | n/a |
TT0304 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $51,075 | $120 | n/a |
TT0304 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $74,585 | $185,000 | n/a |
UC2313 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $275 | $0 | n/a |
UC2313 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,527 | $1,500 | n/a |
UC2313 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,066 | $3,500 | n/a |
UC2313 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $428 | n/a |
UC2313 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $873 | $1,300 | n/a |
UC2313 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $251 | $50 | n/a |
UC2313 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $75 | n/a |
UC2313 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,884 | $16,157 | n/a |
SJ0007 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,635 | $0 | n/a |
SJ0007 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $47,492 | $0 | n/a |
SJ0007 # 06 Y:2023 | 06 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $31,866 | $36,311 | n/a |
SJ0007 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,529 | $0 | n/a |
SJ0007 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $192 | $0 | n/a |
SJ0007 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $951 | $495 | n/a |
SJ0007 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,271 | $13,090 | n/a |
SJ0007 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $128,947 | $765,487 | n/a |
IP0177 # 11 Y:2023 | 11 | 2023 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $409,614 | $304,570 | n/a |
IP0177 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,349 | $3,260 | n/a |
IP0177 # 09 Y:2023 | 09 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,101 | $1,200 | n/a |