IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

294

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0274 # 07 Y:1993 07 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $400 $900 Not Implemented
CO0272 # 01 Y:1993 01 1993 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,930 $250 Implemented
CO0272 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $350 Not Implemented
CO0272 # 03 Y:1993 03 1993 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $960 $2,500 Implemented
CO0272 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $820 Not Implemented
CO0272 # 06 Y:1993 06 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,950 $10,000 Not Implemented
CO0270 # 01 Y:1993 01 1993 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,400 $250 Implemented
CO0270 # 02 Y:1993 02 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $14,790 $16,720 Not Implemented
CO0270 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,020 $2,500 Implemented
CO0270 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,450 $2,850 Implemented
CO0271 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,060 $400 Implemented
CO0271 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,640 $400 Implemented
CO0271 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,260 $2,500 Implemented
CO0271 # 04 Y:1993 04 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,240 $8,000 Not Implemented
CO0271 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,634 $37,430 Implemented
CO0248 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,210 $350 Not Implemented
CO0248 # 02 Y:1992 02 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,380 $4,000 Not Implemented
CO0248 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,170 $730 Not Implemented
CO0248 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,750 $37,860 Not Implemented
CO0248 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $4,760 Not Implemented
CO0248 # 06 Y:1992 06 1992 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,460 $17,470 Not Implemented
CO0248 # 07 Y:1992 07 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $280 $170 Not Implemented
CO0248 # 08 Y:1992 08 1992 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $400 $40 Not Implemented
CO0247 # 01 Y:1992 01 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,020 $1,250 Implemented
CO0247 # 02 Y:1992 02 1992 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,990 $1,800 Implemented