IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0280 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,032 Not Implemented
KU0280 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $100 Implemented
KU0280 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $250 $0 Implemented
KU0280 # 06 Y:1989 06 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $293 $560 Not Implemented
KU0280 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143 $40 Implemented
KU0150 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $3,365 Not Implemented
KU0150 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $993 $1,300 Not Implemented
KU0150 # 03 Y:1985 03 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $567 $0 Not Implemented
KU0150 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $749 $200 Implemented
KU0150 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $214 $0 Implemented
KU0150 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $935 $0 Not Implemented
KU0150 # 07 Y:1985 07 1985 INSTALL AUTOMATIC STACK DAMPER $761 $400 Not Implemented
KU0150 # 08 Y:1985 08 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $284 $100 Implemented
KU0150 # 09 Y:1985 09 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,016 $131 Implemented
KU0150 # 10 Y:1985 10 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $835 $1,500 Not Implemented
KU0150 # 11 Y:1985 11 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $719 $265 Implemented
KU0150 # 12 Y:1985 12 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $688 $400 Not Implemented
KU0087 # 01 Y:1983 01 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,398 $30,000 Implemented
KU0087 # 02 Y:1983 02 1983 OPTIMIZE PLANT POWER FACTOR $15,570 $15,000 Implemented
KU0087 # 03 Y:1983 03 1983 MODERATE COOLING TOWER OUTLET TEMPERATURE $4,858 $0 Implemented
KU0087 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $39,664 $35,000 Implemented
KU0087 # 05 Y:1983 05 1983 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,056 $1,680 Implemented
KU0087 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $2,313 Not Implemented
KU0060 # 01 Y:1982 01 1982 RECOVER WASTE HEAT FROM EQUIPMENT $4,789 $5,000 Not Implemented
KU0060 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $246 $304 Not Implemented