Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
203
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0105 # 07 Y:1987 | 07 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,580 | $6,238 | Implemented |
MA0105 # 08 Y:1987 | 08 | 1987 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,603 | $1,000 | Not Implemented |
MA0096 # 01 Y:1987 | 01 | 1987 | INSULATE BARE EQUIPMENT | $1,581 | $551 | Implemented |
MA0096 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $402 | $78 | Implemented |
MA0096 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,922 | $746 | Implemented |
MA0096 # 04 Y:1987 | 04 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $715 | $450 | Not Implemented |
MA0096 # 05 Y:1987 | 05 | 1987 | INSULATE BARE EQUIPMENT | $1,966 | $1,014 | Not Implemented |
MA0096 # 06 Y:1987 | 06 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,391 | $893 | Not Implemented |
MA0096 # 07 Y:1987 | 07 | 1987 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $22,563 | $4,750 | Implemented |
MA0096 # 08 Y:1987 | 08 | 1987 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,030 | $3,900 | Not Implemented |
MA0066 # 01 Y:1986 | 01 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,416 | $200 | Not Implemented |
MA0066 # 02 Y:1986 | 02 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $248 | $200 | Implemented |
MA0066 # 03 Y:1986 | 03 | 1986 | INSTALL STORM WINDOWS AND DOORS | $474 | $1,000 | Implemented |
MA0066 # 04 Y:1986 | 04 | 1986 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,424 | $0 | Implemented |
MA0058 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,060 | $90 | Implemented |
MA0058 # 02 Y:1986 | 02 | 1986 | INSULATE BARE EQUIPMENT | $3,740 | $5,760 | Implemented |
MA0058 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,028 | $0 | Implemented |
MA0046 # 01 Y:1985 | 01 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $738 | $1,650 | Not Implemented |
MA0046 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $530 | $74 | Implemented |
MA0046 # 03 Y:1985 | 03 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,418 | $168 | Not Implemented |
MA0046 # 04 Y:1985 | 04 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $924 | $1,350 | Not Implemented |
MA0046 # 05 Y:1985 | 05 | 1985 | OPTIMIZE PLANT POWER FACTOR | $776 | $1,875 | Not Implemented |
MA0009 # 01 Y:1984 | 01 | 1984 | INSULATE BARE EQUIPMENT | $2,206 | $2,100 | Not Implemented |
MA0009 # 02 Y:1984 | 02 | 1984 | INSTALL SET-BACK TIMERS | $1,183 | $200 | Implemented |
MA0009 # 03 Y:1984 | 03 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $100 | $0 | Implemented |