IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0014 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,804 $2,500 Implemented
NL0014 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $260 $225 Not Implemented
NL0014 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $0 Implemented
NL0014 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,200 $1,630 Implemented
NL0014 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,430 $12,500 Implemented
NL0012 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Not Implemented
NL0012 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $163 $157 Implemented
NL0012 # 06 Y:2017 06 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $582 $2,100 Not Implemented
NL0012 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $920 $980 Not Implemented
NL0012 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,477 $136 Implemented
NL0012 # 03 Y:2017 03 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,183 $250 Implemented
NL0012 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $9,825 Implemented
IA0446 # 13 Y:2009 13 2009 RECOVER WASTE HEAT FROM EQUIPMENT $21,403 $1,860 Not Implemented
IA0446 # 14 Y:2009 14 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $505 $1,000 Not Implemented
IA0446 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,241 $15 Not Implemented
IA0446 # 11 Y:2009 11 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,917 $1,860 Not Implemented
IA0446 # 10 Y:2009 10 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,136 $740 Implemented
IA0446 # 09 Y:2009 09 2009 INSULATE BARE EQUIPMENT $4,474 $3,180 Not Implemented
IA0446 # 15 Y:2009 15 2009 DIRECT WARMEST AIR TO COMBUSTION INTAKE $333 $213 Not Implemented
IA0446 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $32,570 Implemented
IA0446 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,951 $12,486 Implemented
IA0446 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,189 $29,591 Implemented
IA0446 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,768 $5,819 Implemented
IA0446 # 17 Y:2009 17 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,399 $1,461 Not Implemented
IA0446 # 18 Y:2009 18 2009 TURN OFF STEAM TRACING DURING MILD WEATHER $957 $260 Implemented