IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0396 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,263 $1,487 Not Implemented
MI0396 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,464 $3,060 Not Implemented
MI0396 # 01 Y:2021 01 2021 PAY UTILITY BILLS ON TIME $27,408 $0 Implemented
MI0396 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,588 $100 Not Implemented
MI0396 # 06 Y:2021 06 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,320 $1,290 Not Implemented
MI0396 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,908 $2,020 Implemented
MI0351 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $6,022 $600 Implemented
MI0351 # 09 Y:2019 09 2019 ISOLATE HOT OR COLD EQUIPMENT $508 $600 Implemented
MI0351 # 04 Y:2019 04 2019 USE SOLAR HEAT TO HEAT WATER $34,199 $21,195 Not Implemented
MI0351 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,064 $2,020 Implemented
MI0351 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,493 $11,078 Implemented
MI0351 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $14,383 $25,700 Not Implemented
MI0351 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $87,352 $12,000 Implemented
MI0351 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,747 $480 Implemented
MI0351 # 07 Y:2019 07 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $14,048 $820 Implemented
MI0317 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,154 $2,140 Not Implemented
MI0317 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,556 $8,294 Implemented
MI0317 # 03 Y:2017 03 2017 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $29,203 $11,300 Not Implemented
MI0317 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $33,420 $46,515 Implemented
MI0317 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,418 $1,660 Implemented
MI0317 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,568 $120 Implemented
MI0317 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,683 $1,885 Implemented
MI0317 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $431 $151 Not Implemented
MI0232 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $4,747 $1,137 Not Implemented
MI0232 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $5,045 $640 Implemented