Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0147 # 02 Y:1984 | 02 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $521 | $600 | Implemented |
UD0147 # 01 Y:1984 | 01 | 1984 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $5,049 | $2,250 | Implemented |
UD0147 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,487 | $346 | Implemented |
UD0147 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,055 | $700 | Implemented |
UD0147 # 05 Y:1984 | 05 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $588 | $680 | Implemented |
MA0009 # 03 Y:1984 | 03 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $100 | $0 | Implemented |
MA0009 # 02 Y:1984 | 02 | 1984 | INSTALL SET-BACK TIMERS | $1,183 | $200 | Implemented |
MA0009 # 01 Y:1984 | 01 | 1984 | INSULATE BARE EQUIPMENT | $2,206 | $2,100 | Not Implemented |
GT0229 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,057 | $1,000 | Implemented |
ST0005 # 07 Y:1984 | 07 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,579 | $268 | Implemented |
ST0005 # 06 Y:1984 | 06 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,698 | $269 | Implemented |
GT0229 # 09 Y:1984 | 09 | 1984 | INSULATE BARE EQUIPMENT | $50 | $150 | Implemented |
GT0229 # 08 Y:1984 | 08 | 1984 | INSTALL SET-BACK TIMERS | $330 | $0 | Implemented |
GT0229 # 07 Y:1984 | 07 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,404 | $1,270 | Implemented |
GT0229 # 06 Y:1984 | 06 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $645 | $368 | Implemented |
GT0229 # 04 Y:1984 | 04 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $575 | $50 | Implemented |
ST0005 # 09 Y:1984 | 09 | 1984 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $866 | $846 | Implemented |
GT0229 # 02 Y:1984 | 02 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $795 | $1,000 | Not Implemented |
GT0229 # 01 Y:1984 | 01 | 1984 | INSULATE BARE EQUIPMENT | $6,010 | $2,400 | Implemented |
ST0005 # 02 Y:1984 | 02 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,321 | $720 | Implemented |
ST0005 # 04 Y:1984 | 04 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,781 | $32 | Implemented |
ST0005 # 05 Y:1984 | 05 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,348 | $0 | Implemented |
ST0005 # 03 Y:1984 | 03 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,210 | $350 | Implemented |
ST0006 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,291 | $48 | Implemented |
ST0006 # 02 Y:1984 | 02 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $64 | $0 | Implemented |