Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
190
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0222 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,752 | $200 | Not Implemented |
TA0104 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $6,461 | $244 | Implemented |
TA0104 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,020 | $1,880 | Not Implemented |
TA0104 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,491 | $241 | Implemented |
TA0104 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,785 | $1,444 | Implemented |
TA0104 # 02 Y:2005 | 02 | 2005 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $22,990 | $0 | Implemented |
LE0222 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,714 | $7,800 | Not Implemented |
LE0222 # 02 Y:2005 | 02 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,410 | $49,000 | Not Implemented |
LE0222 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,048 | $2,000 | Not Implemented |
LE0222 # 03 Y:2005 | 03 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $5,760 | $5,100 | Not Implemented |
LE0222 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,793 | $815 | Not Implemented |
LE0222 # 01 Y:2005 | 01 | 2005 | ADD ADDITIONAL PRODUCTION SHIFT | $96,000 | $5,000 | Not Implemented |
TA0104 # 01 Y:2005 | 01 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,070 | $0 | Implemented |
LE0222 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $513 | $480 | Not Implemented |
LE0222 # 09 Y:2005 | 09 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,823 | $500 | Not Implemented |
LE0224 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $49,379 | $10,700 | Not Implemented |
LE0224 # 02 Y:2005 | 02 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $35,540 | $80,000 | Not Implemented |
LE0224 # 01 Y:2005 | 01 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $95,556 | $262,000 | Not Implemented |
LE0224 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $20,478 | $22,000 | Not Implemented |
LE0224 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $28,953 | $4,000 | Not Implemented |
LE0224 # 09 Y:2005 | 09 | 2005 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $13,539 | $12,000 | Not Implemented |
LE0224 # 10 Y:2005 | 10 | 2005 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $4,055 | $520 | Not Implemented |
LE0224 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,329 | $1,500 | Not Implemented |
LE0224 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,035 | $300 | Not Implemented |
LE0224 # 08 Y:2005 | 08 | 2005 | REDESIGN PROCESS | $8,369 | $500 | Not Implemented |