IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0180 # 03 Y:1990 03 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,957 $6,200 Not Implemented
UD0319 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,147 $0 Implemented
UD0319 # 02 Y:1990 02 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,320 $0 Implemented
UD0319 # 03 Y:1990 03 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $13,053 $0 Implemented
UD0319 # 04 Y:1990 04 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,790 $0 Implemented
UD0316 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,000 $0 Not Implemented
UD0316 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,890 $0 Not Implemented
UD0316 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,175 $0 Not Implemented
UD0316 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,611 $0 Not Implemented
UD0316 # 05 Y:1990 05 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,186 $10,000 Not Implemented
MA0177 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,107 $14,700 Not Implemented
MA0177 # 02 Y:1990 02 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,876 $21,853 Not Implemented
MA0177 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $822 $120 Implemented
MA0177 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,411 $8,500 Implemented
OR0084 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $604 $278 Not Implemented
OR0084 # 02 Y:1990 02 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $461 $592 Not Implemented
OR0084 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,603 $2,563 Implemented
OR0084 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $1,837 $3,500 Implemented
OR0084 # 05 Y:1990 05 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,851 $18,000 Implemented
OR0084 # 06 Y:1990 06 1990 OPTIMIZE PLANT POWER FACTOR $3,547 $9,000 Not Implemented
KU0310 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $4,288 Implemented
KU0310 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,513 $280 Implemented
KU0310 # 03 Y:1990 03 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,188 $18,000 Not Implemented
KU0310 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $734 $0 Not Implemented
KU0310 # 05 Y:1990 05 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,069 $1,000 Implemented