IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

292

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0045 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,377 $730 Not Implemented
UM0045 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,355 $1,000 Not Implemented
UM0045 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $9,291 $14,954 Not Implemented
UM0045 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,611 $500 Implemented
UF0135 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,059 $846 Not Implemented
UF0135 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,929 $1,727 Not Implemented
UF0135 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,947 $1,500 Not Implemented
UF0135 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,379 $350 Not Implemented
UF0135 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,778 $17,592 Not Implemented
UF0135 # 06 Y:1995 06 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $23,780 $15,700 Not Implemented
UF0135 # 07 Y:1995 07 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31,315 $4,200 Not Implemented
GT0568 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,640 $13,280 Not Implemented
GT0568 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,180 $10,800 Implemented
GT0568 # 04 Y:1995 04 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,740 $3,500 Not Implemented
GT0568 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,880 $3,190 Implemented
GT0568 # 02 Y:1995 02 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,600 $17,000 Implemented
GT0568 # 03 Y:1995 03 1995 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,630 $4,400 Not Implemented
MS0042 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $348 $778 Implemented
MA0349 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $127 Not Implemented
MS0042 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $64,604 $60,000 Implemented
CO0348 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,260 $400 Implemented
CO0348 # 05 Y:1995 05 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $310 $1,745 Implemented
CO0348 # 04 Y:1995 04 1995 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,425 $3,020 Not Implemented
MA0349 # 04 Y:1995 04 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $777 $2,600 Not Implemented
MA0349 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $47,119 $20,700 Implemented