IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0007 # 05 Y:2007 05 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $181 $34 Implemented
DL0007 # 06 Y:2007 06 2007 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $209 $2,634 Not Implemented
DL0007 # 07 Y:2007 07 2007 REPLACE BOILER $1,325 $10,425 Implemented
DL0007 # 08 Y:2007 08 2007 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $2,561 $28,000 Not Implemented
MI0156 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,688 $1,074 Implemented
MI0156 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $2,655 $5,612 Not Implemented
MI0156 # 03 Y:2007 03 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,301 $2,121 Not Implemented
MI0156 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,674 $1,232 Implemented
MI0156 # 01 Y:2007 01 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $7,785 $1,800 Not Implemented
MI0156 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,033 $30 Implemented
MI0156 # 07 Y:2007 07 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $676 $2,170 Not Implemented
MI0151 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $46,436 $1,955 Not Implemented
MI0151 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $67,528 $120 Implemented
MI0151 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,594 $20,498 Implemented
MI0151 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,109 $1,074 Implemented
MI0151 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,528 $3,010 Not Implemented
MI0151 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,331 $30 Not Implemented
SF0345 # 01 Y:2007 01 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,945 $711 Not Implemented
SF0345 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $6,510 Implemented
SF0345 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $511 $1,404 Not Implemented
SF0345 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,999 $3,759 Implemented
SF0345 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,266 $4,307 Not Implemented
SF0345 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,919 $5,140 Not Implemented
SF0345 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,339 $4,380 Implemented
SF0345 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,951 $2,939 Not Implemented