IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0971 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $972 $50 Implemented
UD0971 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $2,213 $500 Not Implemented
UD0971 # 06 Y:2017 06 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $400 $681 Not Implemented
UD0971 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,936 $3,000 Not Implemented
UD0971 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $51,180 $3,650 Not Implemented
UD0971 # 09 Y:2017 09 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,055 $178,850 Not Implemented
UD0971 # 10 Y:2017 10 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,985 $22,000 Not Implemented
MI0317 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,418 $1,660 Implemented
MI0317 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $33,420 $46,515 Implemented
MI0317 # 03 Y:2017 03 2017 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $29,203 $11,300 Not Implemented
MI0317 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,556 $8,294 Implemented
MI0317 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,568 $120 Implemented
MI0317 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,683 $1,885 Implemented
MI0317 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,154 $2,140 Not Implemented
MI0317 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $431 $151 Not Implemented
OK0976 # 01 Y:2017 01 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,812 $180,000 Implemented
OK0976 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,586 $3,840 Implemented
OK0976 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,176 $61,707 Implemented
OK0976 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,185 $3,480 Not Implemented
OK0976 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,681 $35,200 Not Implemented
OK0976 # 06 Y:2017 06 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,094 $22,000 Not Implemented
OK0976 # 07 Y:2017 07 2017 INSTALL SET-BACK TIMERS $1,177 $240 Implemented
OK0976 # 08 Y:2017 08 2017 KEEP EQUIPMENT CLEAN $885 $240 Implemented
AS0440 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,622 $15,120 Not Implemented
AS0440 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $500 Not Implemented