Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
631
matching recommendationsSIC | 31 | Leather And Leather Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0292 # 01 Y:1986 | 01 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,140 | $12,500 | Not Implemented |
TN0292 # 02 Y:1986 | 02 | 1986 | INSTALL SET-BACK TIMERS | $1,198 | $0 | Implemented |
TN0292 # 03 Y:1986 | 03 | 1986 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $947 | $2,960 | Not Implemented |
TN0292 # 04 Y:1986 | 04 | 1986 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $206 | $175 | Implemented |
TN0292 # 05 Y:1986 | 05 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $152 | $75 | Implemented |
TN0269 # 01 Y:1986 | 01 | 1986 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,310 | $1,500 | Implemented |
TN0269 # 02 Y:1986 | 02 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,414 | $1,800 | Implemented |
TN0269 # 03 Y:1986 | 03 | 1986 | INSTALL SET-BACK TIMERS | $2,001 | $0 | Implemented |
TN0269 # 04 Y:1986 | 04 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $680 | $0 | Implemented |
TN0269 # 05 Y:1986 | 05 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $288 | Implemented |
TN0258 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,018 | $3,600 | Implemented |
TN0258 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,644 | $120 | Implemented |
TN0258 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $765 | $1,200 | Implemented |
TN0258 # 04 Y:1985 | 04 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,362 | $3,000 | Not Implemented |
ST0023 # 01 Y:1985 | 01 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $1,091 | $125 | Implemented |
ST0023 # 02 Y:1985 | 02 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $8,365 | $26,400 | Not Implemented |
ST0023 # 03 Y:1985 | 03 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,753 | $0 | Implemented |
ST0023 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,538 | $6,448 | Implemented |
ST0023 # 05 Y:1985 | 05 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,180 | $96 | Implemented |
ST0023 # 06 Y:1985 | 06 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $266 | $182 | Not Implemented |
ST0023 # 07 Y:1985 | 07 | 1985 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $55,176 | $50,000 | Not Implemented |
ST0023 # 08 Y:1985 | 08 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,472 | $0 | Implemented |
ST0023 # 09 Y:1985 | 09 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $738 | $2,000 | Implemented |
ST0023 # 10 Y:1985 | 10 | 1985 | USE COMPRESSOR AIR FILTERS | $479 | $120 | Implemented |
TN0235 # 01 Y:1984 | 01 | 1984 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $155,565 | $49,200 | Implemented |