IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 31 Leather And Leather Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0195 # 06 Y:2017 06 2017 RECOVER WASTE HEAT FROM EQUIPMENT $665 $750 Not Implemented
TT0195 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,190 $3,450 Not Implemented
TT0195 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,211 $25 Implemented
TT0195 # 07 Y:2017 07 2017 APPLY FOR INVESTMENT INCENTIVES $98 $20 Implemented
TT0195 # 01 Y:2017 01 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,700 $4,000 Not Implemented
TT0195 # 03 Y:2017 03 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,404 $6,000 Not Implemented
TT0195 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,092 $3,050 Implemented
TN0546 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,451 $820 Not Implemented
TN0546 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,801 $0 Not Implemented
TN0546 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,300 $940 Not Implemented
TN0546 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,651 $1,596 Not Implemented
TN0546 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,273 $1,800 Not Implemented
TN0521 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $204 Implemented
TN0521 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,290 $0 Implemented
TN0521 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,353 $195 Implemented
TN0521 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,054 $9,625 Not Implemented
TN0521 # 02 Y:1994 02 1994 REPAIR OR REPLACE STEAM TRAPS $5,579 $725 Not Implemented
TN0521 # 01 Y:1994 01 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $17,374 $3,540 Not Implemented
TN0477 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,120 $0 Not Implemented
TN0477 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $283 $0 Implemented
TN0477 # 03 Y:1993 03 1993 USE SYNTHETIC LUBRICANT $3,013 $1,506 Implemented
TN0477 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,139 $10,080 Implemented
TN0292 # 03 Y:1986 03 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $947 $2,960 Not Implemented
TN0292 # 02 Y:1986 02 1986 INSTALL SET-BACK TIMERS $1,198 $0 Implemented
TN0292 # 01 Y:1986 01 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,140 $12,500 Not Implemented