IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
SIC 311 Leather Tanning And Finishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0510 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $794 $383 Not Implemented
SU0510 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $717 $134 Not Implemented
SU0510 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $898 $44 Not Implemented
SU0510 # 02 Y:2022 02 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $444 $0 Not Implemented
SU0510 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,555 $0 Not Implemented
IC0117 # 07 Y:2006 07 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,442 $3,500 Not Implemented
IC0117 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,809 $34,020 Not Implemented
IC0117 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,057 $0 Not Implemented
IC0117 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,086 $2,100 Not Implemented
IC0117 # 03 Y:2006 03 2006 UPGRADE CONTROLS ON COMPRESSORS $5,541 $1,690 Not Implemented
IC0117 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,391 $8,404 Not Implemented
IC0117 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,256 $8,992 Not Implemented
IC0117 # 08 Y:2006 08 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,574 $88,643 Not Implemented
IC0117 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,880 $0 Not Implemented
IC0117 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $103,343 $192,802 Not Implemented
MA0531 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,532 $6,800 n/a
MA0531 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $2,667 $4,205 n/a
MA0531 # 06 Y:2003 06 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $445 $383 n/a
MA0531 # 02 Y:2003 02 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,438 $43,874 n/a
MA0531 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,738 $6,375 n/a
MA0531 # 01 Y:2003 01 2003 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $31,336 $37,543 n/a
IA0231 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $791 $300 Not Implemented
IA0231 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,567 $169 Implemented
IA0231 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,516 $100 Not Implemented
IA0231 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $278 $466 Not Implemented