IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
SIC 314 Footwear, Except Rubber
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0660 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $3,730 n/a
NC0660 # 02 Y:2021 02 2021 INSTALL COMMON HEADER ON COMPRESSORS $4,229 $10,000 n/a
NC0660 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $100 n/a
NC0660 # 04 Y:2021 04 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,563 $500 n/a
WM0142 # 02 Y:2019 02 2019 USE RADIANT HEATER FOR SPOT HEATING $7,329 $9,450 Implemented
WM0142 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,679 $6,540 Implemented
WM0142 # 10 Y:2019 10 2019 USE PHOTOCELL CONTROLS $103 $201 Not Implemented
WM0142 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $351 $1,115 Implemented
WM0142 # 09 Y:2019 09 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $258 $1,370 Not Implemented
WM0142 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $19,750 $28,500 Not Implemented
WM0142 # 05 Y:2019 05 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $2,700 Implemented
WM0142 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $1,160 Implemented
WM0142 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $418 $750 Not Implemented
WM0142 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,469 $3,500 Implemented
TT0195 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,190 $3,450 Not Implemented
TT0195 # 06 Y:2017 06 2017 RECOVER WASTE HEAT FROM EQUIPMENT $665 $750 Not Implemented
TT0195 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,092 $3,050 Implemented
TT0195 # 01 Y:2017 01 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,700 $4,000 Not Implemented
TT0195 # 03 Y:2017 03 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,404 $6,000 Not Implemented
TT0195 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,211 $25 Implemented
TT0195 # 07 Y:2017 07 2017 APPLY FOR INVESTMENT INCENTIVES $98 $20 Implemented
OR0407 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $590,625 $155,700 Implemented
OR0407 # 02 Y:2002 02 2002 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $38,835 $19,800 Not Implemented
OR0407 # 03 Y:2002 03 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $31,415 $55,000 Implemented
OR0407 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,986 $3,000 Implemented