Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
327
matching recommendationsSIC | 314 | Footwear, Except Rubber |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0660 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,499 | $3,730 | n/a |
NC0660 # 02 Y:2021 | 02 | 2021 | INSTALL COMMON HEADER ON COMPRESSORS | $4,229 | $10,000 | n/a |
NC0660 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $339 | $100 | n/a |
NC0660 # 04 Y:2021 | 04 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,563 | $500 | n/a |
WM0142 # 02 Y:2019 | 02 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $7,329 | $9,450 | Implemented |
WM0142 # 03 Y:2019 | 03 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,679 | $6,540 | Implemented |
WM0142 # 10 Y:2019 | 10 | 2019 | USE PHOTOCELL CONTROLS | $103 | $201 | Not Implemented |
WM0142 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $351 | $1,115 | Implemented |
WM0142 # 09 Y:2019 | 09 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $258 | $1,370 | Not Implemented |
WM0142 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $19,750 | $28,500 | Not Implemented |
WM0142 # 05 Y:2019 | 05 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,795 | $2,700 | Implemented |
WM0142 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $619 | $1,160 | Implemented |
WM0142 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $418 | $750 | Not Implemented |
WM0142 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,469 | $3,500 | Implemented |
TT0195 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,190 | $3,450 | Not Implemented |
TT0195 # 06 Y:2017 | 06 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $665 | $750 | Not Implemented |
TT0195 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,092 | $3,050 | Implemented |
TT0195 # 01 Y:2017 | 01 | 2017 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $36,700 | $4,000 | Not Implemented |
TT0195 # 03 Y:2017 | 03 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,404 | $6,000 | Not Implemented |
TT0195 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,211 | $25 | Implemented |
TT0195 # 07 Y:2017 | 07 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $98 | $20 | Implemented |
OR0407 # 01 Y:2002 | 01 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $590,625 | $155,700 | Implemented |
OR0407 # 02 Y:2002 | 02 | 2002 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $38,835 | $19,800 | Not Implemented |
OR0407 # 03 Y:2002 | 03 | 2002 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $31,415 | $55,000 | Implemented |
OR0407 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,986 | $3,000 | Implemented |