Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,669

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2411 # 05 Y:2024 05 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,372 $5,000 n/a
UL2411 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,308 $50,000 n/a
UL2411 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $76,606 $698,579 n/a
UL2411 # 04 Y:2024 04 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,053 $13,653 n/a
UL2411 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,717 $1,995 n/a
UL2411 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $746 $2,700 n/a
UA0288 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,634 $1,046 n/a
UA0288 # 03 Y:2024 03 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,549 $1,031 n/a
UA0288 # 06 Y:2024 06 2024 OPTIMIZE PLANT POWER FACTOR $8,607 $5,049 n/a
UA0288 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,656 $994 n/a
UA0288 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $16,178 $10,450 n/a
UA0288 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,856 $4,621 n/a
UA0288 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $290,423 $2,558,734 n/a
UA0288 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,645 $1,000 n/a
UA0288 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,987 $8,591 n/a
TT0316 # 10 Y:2024 10 2024 RECOVER WASTE HEAT FROM EQUIPMENT $5,587 $1,500 n/a
TT0316 # 04 Y:2024 04 2024 METER WASTE WATER $22,342 $10,000 n/a
TT0316 # 05 Y:2024 05 2024 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $18,330 $3,200 n/a
TT0316 # 03 Y:2024 03 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $147,843 $200,000 n/a
TT0316 # 09 Y:2024 09 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,504 $60 n/a
TT0316 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,806 $12,000 n/a
TT0316 # 11 Y:2024 11 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,763 $1,345 n/a
TT0316 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $11,283 $30 n/a
TT0316 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,400 $10,380 n/a
TT0316 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,156,718 $75,000 n/a