IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0931 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $11,689 Not Implemented
OK0931 # 05 Y:2016 05 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,235 $590 Implemented
OK0931 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,555 $1,498 Implemented
OK0931 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,661 $28,728 Not Implemented
OK0931 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,151 $1,256 Not Implemented
OK0931 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,798 $23,574 Not Implemented
OK0931 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $143 $182 Not Implemented
OK0931 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,634 $8,294 Not Implemented
OK0931 # 07 Y:2016 07 2016 USE RADIANT HEATER FOR SPOT HEATING $2,973 $11,940 Not Implemented
KU0501 # 02 Y:1998 02 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,130 $6,880 Implemented
KU0501 # 01 Y:1998 01 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,090 $33,780 Not Implemented
KU0501 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $480 $1,470 Not Implemented
KU0501 # 09 Y:1998 09 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,550 $20,000 Not Implemented
KU0501 # 08 Y:1998 08 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $1,330 Not Implemented
KU0501 # 05 Y:1998 05 1998 USE SYNTHETIC LUBRICANT $560 $1,760 Implemented
KU0501 # 03 Y:1998 03 1998 IMPROVE COMBUSTION CONTROL CAPABILITY $2,960 $10,890 Not Implemented
KU0501 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $440 Implemented
KU0501 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $240 Implemented
KU0464 # 01 Y:1996 01 1996 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $785,416 $3,675,000 Implemented
KU0464 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65,015 $163,148 Implemented
KU0464 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,993 $10,657 Implemented
KU0464 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,327 $3,877 Implemented
KU0464 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $1,911 Not Implemented
KU0464 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,643 $9,918 Implemented
KU0440 # 09 Y:1994 09 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $213 $220 Not Implemented