IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0234 # 01 Y:2024 01 2024 ISOLATE HOT OR COLD EQUIPMENT $36,400 $82,500 n/a
DL0234 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,550 $30,000 n/a
DL0234 # 03 Y:2024 03 2024 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $95,717 $35,600 n/a
DL0234 # 04 Y:2024 04 2024 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $76,734 $166,100 n/a
LE0496 # 09 Y:2020 09 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,150 $18,250 Not Implemented
LE0496 # 05 Y:2020 05 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $1,393 $3,150 Not Implemented
LE0496 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,545 $5,000 Not Implemented
LE0496 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,000 $0 Not Implemented
LE0496 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,682 $0 Not Implemented
LE0496 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,482 $3,000 Not Implemented
LE0496 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,207 $3,300 Not Implemented
LE0496 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,991 $9,200 Not Implemented
LE0496 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,578 $29,000 Not Implemented
LE0472 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,747 $2,000 Implemented
LE0472 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $208 $285 Implemented
LE0472 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $7,038 $1,500 Implemented
LE0472 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,212 $57,800 Implemented
LE0472 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,354 $563 Not Implemented
LE0472 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $6,000 Not Implemented
DL0169 # 02 Y:2016 02 2016 KEEP EQUIPMENT CLEAN $13,120 $2,500 Implemented
DL0169 # 03 Y:2016 03 2016 ADJUST BURNERS FOR EFFICIENT OPERATION $117,000 $34,000 Not Implemented
DL0169 # 04 Y:2016 04 2016 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,060 $5,000 Not Implemented
DL0169 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $11,160 $11,160 Not Implemented
DL0169 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $300,500 $1,937,040 Not Implemented
DL0169 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $163,600 $12,000 Not Implemented