IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3231 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0647 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $82,721 $146,400 Not Implemented
WV0647 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $1,681 $195 Implemented
WV0647 # 10 Y:2023 10 2023 REDUCE VENTILATION AIR $2,625 $5,002 Not Implemented
WV0647 # 09 Y:2023 09 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $2,777 $9,380 Not Implemented
WV0647 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,315 $114 Implemented
WV0647 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,516 $864 Implemented
WV0647 # 06 Y:2023 06 2023 UPGRADE CONTROLS ON COMPRESSORS $3,789 $6,450 Not Implemented
WV0647 # 05 Y:2023 05 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,595 $9,440 Implemented
WV0647 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,411 $1,508 Implemented
WV0647 # 03 Y:2023 03 2023 MINIMIZE WATER USAGE $7,590 $11,644 Implemented
WV0647 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,420 $19,102 Implemented
IP0174 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $42,275 $0 Implemented
IP0174 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,594 $78,000 Not Implemented
IP0174 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,518 $123,235 Implemented
IP0174 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,006 $2,730 Implemented
IP0174 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,877 $14,812 Implemented
IP0174 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,401 $1,048 Implemented
SJ0003 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $960 $2,889 Implemented
SJ0003 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $326 $20 Implemented
SJ0003 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,596 $5,020 Implemented
SJ0003 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103 $218 Implemented
SJ0003 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $57,369 $319,999 Implemented