IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
Reset
SIC 3253 Ceramic Wall And Floor Tile
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0196 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $1,227 Implemented
UA0196 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,798 $1,165 Implemented
UA0196 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,660 $100 Not Implemented
UA0196 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,085 $3,000 Not Implemented
UA0196 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $7,511 $3,443 Implemented
UA0196 # 08 Y:2018 08 2018 BURN A LESS EXPENSIVE GRADE OF FUEL $1,051 $1,325 Not Implemented
TT0181 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $35,984 $24,000 Not Implemented
TT0181 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $31,353 $38,924 Not Implemented
TT0181 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,164 $10,000 Implemented
TT0181 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $12,441 $27,333 Not Implemented
TT0181 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,573 $7,000 Implemented
TT0181 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $6,973 $6,000 Implemented
TT0181 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,976 $13,245 Implemented
TT0181 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,794 $500 Not Implemented
TT0181 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,058 $3,050 Implemented
TT0181 # 10 Y:2016 10 2016 OPTIMIZE PLANT POWER FACTOR $3,012 $8,000 Implemented
UA0152 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276,882 $132,605 Not Implemented
UA0152 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $1,325 $905 Implemented
UA0152 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,331 $3,245 Implemented
UA0152 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,335 $800 Not Implemented
UA0152 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,638 $4,800 Not Implemented
AM0579 # 01 Y:2010 01 2010 DEVELOP STANDARD OPERATING PROCEDURES $1,058,450 $0 Not Implemented
AM0579 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,370 $48,100 Not Implemented
AM0579 # 03 Y:2010 03 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,100 $0 Not Implemented
AM0579 # 04 Y:2010 04 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $14,800 $2,500 Not Implemented