IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3259 Structural Clay Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0609 # 05 Y:2021 05 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $308 $920 Not Implemented
SD0609 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,216 $2,319 Not Implemented
SD0609 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,053 $225 Not Implemented
SD0609 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $821 $0 Not Implemented
SD0609 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,886 $1,396 Not Implemented
SD0317 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,972 $15,200 Not Implemented
SD0317 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,800 $10,000 Not Implemented
SD0317 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $1,552 $600 Not Implemented
SD0317 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,481 $4,500 Not Implemented
SD0317 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,969 $200 Not Implemented
SD0317 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,354 $16 Not Implemented
SD0317 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $18,680 $350 Not Implemented
SF0035 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,055 $1,298 Implemented
SF0035 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,720 $21,935 Not Implemented
SF0035 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,368 $900 Implemented
SF0035 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $116,693 $13,400 Not Implemented
SF0035 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $781 $0 Implemented
SF0035 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,453 $4,943 Implemented
SF0035 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $25,360 $12,000 Not Implemented