IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
SIC 3264 Porcelain Electrical Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0051 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $418 $1,250 Not Implemented
NL0051 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN WATER LINES AND VALVES $435 $85 Implemented
NL0051 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $631 $500 Implemented
NL0051 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,333 $13,737 Not Implemented
NL0051 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,482 $984 Implemented
NL0051 # 01 Y:2020 01 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,034 $128 Not Implemented
NL0051 # 02 Y:2020 02 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $12,899 $13,024 Implemented
TT0210 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,508 $3,630 Implemented
TT0210 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,663 $2,000 Implemented
TT0210 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $716 $250 Implemented
TT0210 # 01 Y:2018 01 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $13,015 $9,600 Implemented
TT0210 # 05 Y:2018 05 2018 APPLY FOR INVESTMENT INCENTIVES $579 $100 Implemented
OK0931 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $143 $182 Not Implemented
OK0931 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,634 $8,294 Not Implemented
OK0931 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,151 $1,256 Not Implemented
OK0931 # 05 Y:2016 05 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,235 $590 Implemented
OK0931 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,798 $23,574 Not Implemented
OK0931 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,661 $28,728 Not Implemented
OK0931 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,555 $1,498 Implemented
OK0931 # 07 Y:2016 07 2016 USE RADIANT HEATER FOR SPOT HEATING $2,973 $11,940 Not Implemented
OK0931 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $11,689 Not Implemented
SU0292 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,754 $5,714 Not Implemented
SU0292 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,849 $24,883 Not Implemented
SU0292 # 08 Y:2010 08 2010 OPTIMIZE PLANT POWER FACTOR $12,124 $37,200 Not Implemented
SU0292 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $57,316 $175,000 Not Implemented