Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,533
matching recommendationsSIC | 327 | Concrete, Gypsum, And Plaster Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0251 # 02 Y:2025 | 02 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,414 | $0 | n/a |
DL0251 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,096 | $13,500 | n/a |
DL0251 # 01 Y:2025 | 01 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,231 | $0 | n/a |
DL0251 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS | $386 | $1,750 | n/a |
DL0251 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,180 | $1,075 | n/a |
DL0251 # 08 Y:2025 | 08 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $10,284 | $6,448 | n/a |
DL0251 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,824 | $0 | n/a |
DL0251 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,031 | $7,046 | n/a |
DL0251 # 07 Y:2025 | 07 | 2025 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $1,561 | $16,500 | n/a |
LE0570 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,252 | $5,000 | Implemented |
LE0570 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,168 | $26,500 | Implemented |
LE0570 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $55,246 | $42,000 | Implemented |
LE0570 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,292 | $0 | Implemented |
LE0570 # 06 Y:2024 | 06 | 2024 | INSTALL BACK-UP EQUIPMENT | $46,731 | $90,000 | Implemented |
LE0570 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,515 | $15,000 | Implemented |
UW2404 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,140 | $25,000 | Implemented |
UW2404 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $114,442 | $742,868 | Not Implemented |
UW2404 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,990 | $112,500 | Implemented |
UW2404 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,693 | $75,000 | Implemented |
UW2404 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $141,402 | $150,381 | Implemented |
DL0234 # 03 Y:2024 | 03 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $95,717 | $35,600 | Not Implemented |
DL0234 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,550 | $30,000 | Not Implemented |
DL0234 # 04 Y:2024 | 04 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $76,734 | $166,100 | Not Implemented |
DL0234 # 01 Y:2024 | 01 | 2024 | ISOLATE HOT OR COLD EQUIPMENT | $36,400 | $82,500 | Not Implemented |
DL0231 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $25,112 | $9,768 | Not Implemented |