IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
SIC 3271 Concrete Block And Brick
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0058 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,559 $10,900 Not Implemented
TT0058 # 02 Y:2010 02 2010 INSTALL SKYLIGHTS $7,020 $12,100 Not Implemented
TT0058 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $0 Implemented
TT0058 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $584 $850 Implemented
NC0329 # 01 Y:2005 01 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,470 $3,000 Not Implemented
NC0329 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,086 $2,000 Not Implemented
NC0329 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $200 Implemented
NC0329 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $38 $28 Implemented
NC0329 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,036 $1,770 Not Implemented
NC0329 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $50 Not Implemented
NC0329 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149 $249 Implemented
NC0329 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,379 $2,200 Implemented
SU0215 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,049 $0 Not Implemented
SU0215 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,264 $0 Implemented
SU0215 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,058 $0 Implemented
SU0215 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,712 $488 Implemented
SU0215 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $1,814 $1,000 Implemented
SU0215 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,078 $579 Implemented
UD0574 # 01 Y:1999 01 1999 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $53,280 $5,000 Not Implemented
UD0574 # 02 Y:1999 02 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $44,950 $110,000 Not Implemented
UD0574 # 03 Y:1999 03 1999 USE A DIFFERENT OR RECYCLED RAW MATERIAL $11,550 $0 Not Implemented
UD0574 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,572 $0 Implemented
UD0574 # 05 Y:1999 05 1999 REDUCE OR ELIMINATE WASTE $6,643 $10,000 Not Implemented
CO0436 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $566 Implemented
CO0436 # 02 Y:1999 02 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $180 $800 Not Implemented