IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

360

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1022 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,106 $92,608 Implemented
SJ0004 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $238 Implemented
SJ0004 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,246 $90,267 Implemented
SJ0004 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,799 $3,878 Implemented
AS0535 # 01 Y:2022 01 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,534 $44,427 Implemented
AS0535 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $539 $156 Implemented
UU0207 # 03 Y:2022 03 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,884 $750 Implemented
UU0207 # 08 Y:2022 08 2022 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $265 $750 Implemented
UU0207 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $1,000 Implemented
UU0207 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $626 $1,700 Implemented
UU0207 # 05 Y:2022 05 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,912 $1,585 Implemented
UU0207 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,008 $3,433 Implemented
AM0794 # 07 Y:2020 07 2020 PAY UTILITY BILLS ON TIME $127 $0 Implemented
AM0794 # 05 Y:2020 05 2020 USE SYNTHETIC LUBRICANT $801 $100 Implemented
AM0794 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $990 $450 Implemented
AM0794 # 03 Y:2020 03 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,100 $8 Implemented
AM0794 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,250 $2,000 Implemented
AM0794 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,215 $2,000 Implemented
SF0544 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $920 $0 Implemented
SF0544 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $249,622 $1,187,556 Implemented
SF0544 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,820 $9,188 Implemented
SF0544 # 02 Y:2019 02 2019 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $1,610 $2,208 Implemented
LE0472 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $208 $285 Implemented
LE0472 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $7,038 $1,500 Implemented
LE0472 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,212 $57,800 Implemented