IAC logo
IAC Assessment: UU0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2022
Principal Product Concrete and Gypsum
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 36,000
Annual Production 132,000 Units
Production Hrs. Annual 3,120
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,963 305,600 kWh $0.04
Electricity Demand $28,396 1,750 kW-months/year $16.23
Electricity Fees $4,566 - $ -
Natural Gas $22,207 3,192 MMBtu $6.96
Fuel Oil #1 $25,106 1,165 MMBtu $21.55
Fuel Oil #2 $4,780 243 MMBtu $19.65
TOTAL ENERGY COSTS $188,044
RECOMMENDED SAVINGS* $37,552 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,545
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$15,757
Cost:
$75,487
- - - - - - $15,757 731 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,757
731
MMBtu
-
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$7,250
Cost:
$5,000
- - - - - - - - $7,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$7,250
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$6,884
Cost:
$750
- - - - - - - - $6,884 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$6,884
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,008
Cost:
$3,433
- - $4,008 247 - - - - - - -
-
kWh
$4,008
247
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,912
Cost:
$1,585
- - - - $1,912 275 - - - - -
-
kWh
-
-
kW-months/year
$1,912
275
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$850
Cost:
$1,000
$295 8,206 $555 34 - - - - - - $295
8,206
kWh
$555
34
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$626
Cost:
$1,700
$626 17,308 - - - - - - - - $626
17,308
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$265
Cost:
$750
$91 2,533 $174 11 - - - - - - $91
2,533
kWh
$174
11
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$37,552
Cost:
$89,705
$1,013 28,047 $4,736 292 $1,912 275 $15,757 731 $14,134 - $1,013
28,047
kWh
$4,736
292
kW-months/year
$1,912
275
MMBtu
$15,757
731
MMBtu
$14,134
-
$
TOTAL IMPLEMENTED Savings:
$14,545
Cost:
$9,218
$1,013 28,047 $4,736 292 $1,912 275 - - $6,884 - $1,013
28,047
kWh
$4,736
292
kW-months/year
$1,912
275
MMBtu
-
-
MMBtu
$6,884
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost