IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

311

matching recommendations
Reset
SIC 3273 Ready-mixed Concrete
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0389 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $575 $142 Implemented
MS0389 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $176 $413 Not Implemented
MS0389 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89 $796 Not Implemented
TA0080 # 01 Y:2004 01 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $67,776 $13,000 Implemented
TA0080 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,160 $585 Implemented
TA0080 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,900 $875 Implemented
TA0080 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,990 $1,600 Implemented
TA0080 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,000 $1,000 Implemented
OR0438 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,850 $24,500 Implemented
OR0438 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,950 $0 Implemented
OR0438 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $3,000 Implemented
OR0438 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,260 $290 Not Implemented
OR0438 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,500 $150 Implemented
AS0338 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $392 $1,387 Not Implemented
AS0338 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $281 $0 Not Implemented
AS0338 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $395 $1,422 Implemented
AS0338 # 04 Y:2002 04 2002 REPLACE BOILER $1,014 $2,300 Not Implemented
AS0338 # 05 Y:2002 05 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $875 $2,400 Implemented
AS0338 # 06 Y:2002 06 2002 $20,025 $38,900 Not Implemented
AS0339 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $393 $1,000 Not Implemented
AS0339 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $286 $314 Implemented
AS0339 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $45,235 $1,540 Not Implemented
AS0339 # 04 Y:2002 04 2002 $113,273 $9,000 Implemented
AS0339 # 05 Y:2002 05 2002 $40,037 $40,000 Not Implemented
TA0040 # 01 Y:2002 01 2002 USE A DIFFERENT OR RECYCLED RAW MATERIAL $11,200 $12,425 Implemented