IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
SIC 3291 Abrasive Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0438 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $15,093 $1,615 Not Implemented
UF0438 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85,202 $72,075 Not Implemented
UF0438 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $22,343 $1,105 Not Implemented
MI0190 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,345 $1,020 Implemented
MI0190 # 02 Y:2010 02 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,171 $2,804 Not Implemented
MI0190 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,721 $2,507 Implemented
MI0190 # 04 Y:2010 04 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,587 $700 Not Implemented
MI0190 # 05 Y:2010 05 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,758 $4,871 Not Implemented
AM0575 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,350 $78,700 Not Implemented
AM0575 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,600 $5,000 Implemented
AM0575 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $20,350 $9,350 Not Implemented
AM0575 # 04 Y:2010 04 2010 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $18,870 $170,000 Not Implemented
AM0575 # 05 Y:2010 05 2010 OPTIMIZE PLANT POWER FACTOR $18,400 $54,200 Not Implemented
AM0575 # 06 Y:2010 06 2010 INSTALL SKYLIGHTS $13,790 $68,500 Not Implemented
AM0575 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $5,523 $8,520 Not Implemented
AM0575 # 08 Y:2010 08 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,950 $450 Implemented
AM0575 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $460 Implemented
AM0575 # 10 Y:2010 10 2010 USE SYNTHETIC LUBRICANT $745 $0 Not Implemented
LE0293 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,196 $58,455 Implemented
LE0293 # 01 Y:2009 01 2009 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $25,144 $15,000 Implemented
LE0293 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,797 $1,800 Implemented
LE0293 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,105 $2,932 Implemented
LE0293 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $2,864 $700 Implemented
LE0293 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $717 $1,675 Implemented
LE0293 # 07 Y:2009 07 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $356 $2,250 Not Implemented