Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 3291 | Abrasive Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0777 # 03 Y:2008 | 03 | 2008 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $86,400 | $85,000 | Not Implemented |
UD0777 # 15 Y:2008 | 15 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $1,436 | $0 | Not Implemented |
UD0777 # 14 Y:2008 | 14 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,509 | $3,815 | Implemented |
UD0777 # 13 Y:2008 | 13 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,240 | $0 | Implemented |
UD0777 # 12 Y:2008 | 12 | 2008 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $8,318 | $19,000 | Implemented |
UD0777 # 11 Y:2008 | 11 | 2008 | USE MINIMUM STEAM OPERATING PRESSURE | $7,900 | $0 | Not Implemented |
UD0777 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,188 | $28,755 | Not Implemented |
UD0777 # 09 Y:2008 | 09 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,821 | $1,900 | Not Implemented |
UD0777 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,252 | $1,000 | Implemented |
UD0777 # 07 Y:2008 | 07 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $35,347 | $15,000 | Implemented |
UD0777 # 06 Y:2008 | 06 | 2008 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $35,664 | $50,000 | Implemented |
UD0777 # 05 Y:2008 | 05 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $45,421 | $74,873 | Not Implemented |
UD0777 # 04 Y:2008 | 04 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $70,469 | $40,000 | Implemented |
UD0777 # 02 Y:2008 | 02 | 2008 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $468,137 | $140,000 | Not Implemented |
UD0777 # 01 Y:2008 | 01 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $621,360 | $28,800 | Not Implemented |
ND0353 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,237 | $10,801 | Implemented |
ND0353 # 11 Y:2000 | 11 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $267 | $200 | Implemented |
ND0353 # 10 Y:2000 | 10 | 2000 | METER WASTE WATER | $1,127 | $200 | Implemented |
ND0353 # 09 Y:2000 | 09 | 2000 | MINIMIZE WATER USAGE | $1,028 | $4,025 | Not Implemented |
ND0353 # 08 Y:2000 | 08 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,782 | $25,000 | Implemented |
ND0353 # 07 Y:2000 | 07 | 2000 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,286 | $8,120 | Not Implemented |
ND0353 # 06 Y:2000 | 06 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $1,117 | $1,714 | Implemented |
ND0353 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,107 | $140 | Implemented |
ND0353 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,489 | $300 | Implemented |
ND0353 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,205 | $11,337 | Implemented |