IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3295 Minerals, Ground Or Treated
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0447 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,428 $19,015 Not Implemented
UF0447 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,286 $680 Not Implemented
UF0447 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,042 $0 Not Implemented
UF0447 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $125 $120 Not Implemented
UF0447 # 04 Y:2011 04 2011 USE PHOTOCELL CONTROLS $439 $147 Not Implemented
UF0447 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,292 $12,615 Not Implemented
UF0447 # 02 Y:2011 02 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $455 $985 Not Implemented
UF0447 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $12,701 $6,982 Not Implemented
UF0269 # 10 Y:2001 10 2001 $777 $525 Not Implemented
UF0269 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $775 $1,200 Implemented
UF0269 # 09 Y:2001 09 2001 $10,697 $0 Not Implemented
UF0269 # 08 Y:2001 08 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $316 $1,895 Implemented
UF0269 # 07 Y:2001 07 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,760 $3,985 Implemented
UF0269 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $20,239 $2,500 Implemented
UF0269 # 05 Y:2001 05 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $314 $75 Implemented
UF0269 # 04 Y:2001 04 2001 ADD AREA LIGHTING SWITCHES $2,086 $2,358 Implemented
UF0269 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,613 $64,742 Implemented
UF0269 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $410 Implemented