Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3299 Nonmetallic Mineral Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0367 # 03 Y:2008 03 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,340 $5,460 Implemented
SF0367 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,318 $11,290 Implemented
SF0367 # 11 Y:2008 11 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,022 $18,000 Implemented
SF0367 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,802 $10,433 Implemented
SF0367 # 09 Y:2008 09 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,030 $7,537 Implemented
SF0367 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,234 $9,745 Implemented
SF0367 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $9,914 $1,497 Implemented
SF0367 # 06 Y:2008 06 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,633 $1,078 Implemented
SF0367 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,679 $143 Implemented
SF0367 # 04 Y:2008 04 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $360 $0 Implemented
SF0367 # 02 Y:2008 02 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $121,210 $720 Implemented
SF0367 # 01 Y:2008 01 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $169,502 $10,920 Implemented
DL0023 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $26,000 $0 Not Implemented
DL0023 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $590 $150 Not Implemented
DL0023 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $500 Not Implemented
DL0023 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,500 $22,600 Not Implemented
DL0023 # 04 Y:2008 04 2008 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $31,000 $26,000 Not Implemented
DL0023 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $6,900 $0 Not Implemented
DL0023 # 02 Y:2008 02 2008 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $8,300 $0 Not Implemented